Signed in as:
filler@godaddy.com
Join us for upcoming GIGAWATT.events to explore that vast opportunities at GIGAWATT.LAND - We can't wait to see you there.
Private plane flyover tours - A comprehensive Tour across 100,000 acre span
June 30th 2026
Energy & DataCenterCamp.us - site visits - Luncheon sponsored by GIGAWATT.LAND
June 30th & July 16th 2026
AFCOM / 7x24 Arizona ExChange Chapter in Phoenix - Luncheon sponsored by GIGAWATT.LAND
July 15th 2026

June 30th 2026
June 30th & July 16th 2026
June 30th & July 16th 2026

High-voltage power infrastructure is already in place at GigaWatt.land, with multi-level transmission at 345 kV and 500 kV originating from the neighboring retired coal power plant within this designated energy community and Qualified Opportunity Zone (QOZ).

Renewable power production from solar
(1.5 GW under construction) and wind (existing 400MW + 600 MW expansion) is co-located as an integrated energy source, combined with long-duration energy storage and a grid built-in redundancyloop.network

Existing natural gas pipelines at the property, together with planned 36-inch and 42-inch expansions, support capacities of more than 2.7 Bcf/d—equivalent to approximately 12+ GW of power generation.

Onsite water is supplied by existing wells drawing from a massive 27,000-square-mile aquifer located at the center of the property and is co-located to a waste water treatment plant.

Onsite fiber-optic infrastructure, together with adjacent dark-fiber lines from multiple operators, provides a multi-tier backbone with redundant loop architecture.

Onsite geothermal power will serve as an additional redundancy energy resource, leveraging the dormant volcanic structures located adjacent to the property.

Power needs are above 100 MegaWatt and up to 15 GW with LDES & 2N redundancy

Your land needs are at least 100 acres or up to 2,000 acres to build your data center (BYO)

Your Investments to support the Power House & AI Data Center acceleration
Onsite Power for up to 15.0 Gigawatt from several power sources.
We love to know what your needs to supply you with the right power.
Copyright © 2025 Gigawatt.Land - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.